Guide to Choosing On-Premises, Colocation, and Cloud Infrastructure

DataBank · April 28, 2026 · ✓ verified

DataBank has published a comprehensive 2026 guide comparing on-premises, colocation, and public cloud infrastructure and positioning its Data Center Evolved™ platform as the foundation for hybrid strategies.

  • Main announcement: DataBank publishes an objective infrastructure guide and promotes the Data Center Evolved™ platform across 75+ U.S. facilities, providing flexible colocation, direct cloud connectivity (AWS, Azure, Google Cloud), and contract portability; the guide includes a detailed 5-year cost analysis showing On-Premises $5.6M, Colocation $5.75M, and Public Cloud $9.25M totals for the presented 100-server scenario.
  • Background and details: The guide offers a decision framework (workload inventory, connectivity, migration sequencing, continuous optimization), operational metrics (latency, throughput, staffing), and real customer cases including a Financial Services Firm with $6.2M annual cloud spend repatriation yielding 37% cost reduction, and a Healthcare SaaS Provider repatriation yielding 39% cost reduction; implementation timelines and deployment times are specified (e.g., on-premises 6–18 months, colocation 2–8 weeks, cloud minutes–hours).
Keep reading
OVHcloud case studies: Scaling infrastructure for AI and growth OVHcloud · Jun 24 Bundesbank: Translate Europe’s Strength Into Sustainable Economic Growth Bundesbank | Germany · Jun 24 Economic Consequences of Section 232 Tariffs on Semiconductor Imports Information Technology and Innovation Foundation · Jun 24 Virginia Budget Prioritizes Data Centers Over Citizens’ Rights The Piedmont Environmental Council · Jun 23
Founding Members — first 50 seats
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →

30-day full refund — no forms, cancel anytime.