Ceres launches 10.8kW solid oxide stack for data centers

Hydrogen Europe · April 15, 2026 · ✓ verified

Ceres has launched a new 10.8kW solid oxide stack (Endura).

  • Main announcement: Ceres has launched the Endura 10.8kW solid oxide stack, a steel substrate-based solid oxide cell stack designed for on-site data center power (fuel cell configurations) and green hydrogen production (electrolysis setups); the cells operate at 450–630ºC.
  • Background/details: The Endura stack is based on Ceres’ steel substrate-based solid oxide cells, offered by UK technology licensor Ceres; the company states the stack could cut green hydrogen production costs, and no specific pricing or commercial timelines were provided in the announcement.
Keep reading
Flexible data centers can cut power costs but raise emissions MIT · Jun 26 Virginia advocates urge SCC to make data centers pay The Piedmont Environmental Council · Jun 25 Study finds health harms from Vantage VA2 gas turbines The Piedmont Environmental Council · Jun 25 Massive Joshua Falls-Yeat transmission line threatens Virginia farms The Piedmont Environmental Council · Jun 25
Founding Members — first 50 seats
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →

30-day full refund — no forms, cancel anytime.