GE Vernova to refurbish Chandrapur-Ramagundam 1,000 MW HVDC link

GE Vernova · December 23, 2025 · ✓ verified

GE Vernova Inc. has announced that its Electrification Systems business won a contract from Power Grid Corporation of India Limited (POWERGRID) to refurbish the 1,000 MW Chandrapur–Ramagundam back-to-back HVDC interconnection between India’s western and southern grids.

  • Scope and technical details: GE Vernova will upgrade both 500 MW converter stations at Chandrapur and Ramagundam, modernize HVDC control and protection systems, and replace legacy converter valves with advanced technology manufactured in India, aiming to extend asset life, enhance energy efficiency, and improve grid flexibility for rising renewable penetration; the order was booked in December 2025.
  • Context and energy transition role: The HVDC link, commissioned in the late 1990s, balances power flows between fossil-rich western and hydro-rich southern regions, supporting India’s target of 500 GW non-fossil capacity by 2030 by enabling large-scale renewable power transfers, grid stability, and secure, sustainable power system development; GE Vernova positions this project within its broader grid modernization and energy transition strategy.
Keep reading
Nordic data centers pioneer sustainable cooling and heat reuse atNorth · Jun 22 Data4 launches major European recruitment campaign for growth DATA4 Group · Jun 22 NVIDIA Rubin enables 45°C liquid-cooled AI data centers NVIDIA · Jun 22 Equinix trials hydrogen power units at Dublin data center Hydrogen Europe · Jun 19
Telborg · US Data Centers
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →