Azerbaijan opens Khankendi-1 substation and expands green grid

President of Azerbaijan Republic · December 23, 2025 · ✓ verified

President of the Republic of Azerbaijan Ilham Aliyev has inaugurated the new 110/35/10 kV Khankendi-1 substation operated by Azerenerji OJSC in the city of Khankendi.

  • Khankendi-1, the first closed-type 110 kV substation in the liberated regions, was built to urban grid standards, connected via an 11 km high-voltage line from Shusha (including 1.8 km underground cable), and will supply Khankendi, Aghdara, Khojaly, and Khojavend with reliable power using a Micro-SCADA digital control system.
  • Azerenerji has constructed about 1,000 km of high-voltage lines and 12 new substations forming a 330/110 kV ring network across Karabakh and East Zangezur, upgraded key hubs (including the Jabrayil Energy Hub and Imishli, Aghjabadi, Ganja, Navahi, Jabrayil 330 kV, and Sangachal 220 kV substations), deployed digital monitoring with drones and thermal imaging, and is building CIS-largest Battery Energy Storage Systems at Absheron and Aghdash to integrate 2 GW of new renewables using Wide Area Monitoring and Control systems.
Keep reading
Investor Tour 2026 showcases Armenia's AI startup ecosystem Darpass · Nov 19 ITIF webinar on public opposition to data centers Information Technology and Innovation Foundation · Aug 26 AMAX promotes AI infrastructure offerings for NVIDIA GTC 2026 AMAX Engineering · Aug 22 AMAX details three-agent on-prem AI factory workflow AMAX Engineering · Aug 21
Telborg · US Data Centers
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →

Every field traced to a primary source.