Enhanced geothermal systems could expand U.S. geothermal power generation

U.S. Energy Information Administration · February 19, 2026 · ✓ verified

Fervo Energy is constructing the first large-scale commercial enhanced geothermal system (EGS) power generator in the United States (Cape Generating Station), planned to come online in June 2026.

  • Main announcement:Fervo Energy’s Cape Generating Station is under construction with a planned maximum capacity of 53 MW (28 MW net summer capacity) and is scheduled online June 2026; two additional 53 MW units at the same location are expected to begin operation January 2027, and Fervo has signed two PPAs totaling 320 MW with Southern California Edison for further expansion in 2028.
  • Background and other details: Ongoing federal and commercial efforts include DOE-sponsored FORGE research, Department of Defense partnerships with six geothermal developers to power bases in California, Idaho, Nevada, New Mexico, and Texas, a Rodatherm Energy Corp. closed-loop pilot expected by January 2028, and a Meta–SAGE agreement to supply up to 150 MW of new geothermal power east of the Rocky Mountains.
Keep reading
JUPITER exascale powers brain mapping, climate, 6G and quantum NVIDIA · Jun 22 NAIRR pilot accelerates scientific AI research with NVIDIA DGX NVIDIA · Jun 22 Eco Wave Power Uses NVIDIA AI To Harness Wave Energy NVIDIA · Jun 22 Nordic data centers pioneer sustainable cooling and heat reuse atNorth · Jun 22
Telborg · US Data Centers
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →