Equinix trials hydrogen power units at Dublin data center

Hydrogen Europe · June 19, 2026 · ✓ verified

Equinix has trialled a new hydrogen power unit at its Blanchardstown, Dublin data center.

  • 12-week pilot: A 12-week pilot has been launched deploying two hydrogen-powered generators developed by GeoPura; the units are shipping container-sized and are being used to support cooling systems at the data center.
  • Supply and location details:GeoPura is supplying hydrogen from renewable sources for the project; the trial is located at Equinix’s Blanchardstown, Dublin site and is described as a short-term pilot (12 weeks) with both generators installed on site.
Keep reading
Investor Tour 2026 showcases Armenia's AI startup ecosystem Darpass · Nov 19 ITIF webinar on public opposition to data centers Information Technology and Innovation Foundation · Aug 26 DataBank leadership interview on technology teams DataBank · Aug 19 DataBank supports Texas rules for responsible data centers DataBank · Aug 19
Telborg · US Data Centers
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →

Every field traced to a primary source.