Equinix trials hydrogen power units at Dublin data center

Hydrogen Europe · June 19, 2026 · ✓ verified

Equinix has trialled a new hydrogen power unit at its Blanchardstown, Dublin data center.

  • 12-week pilot: A 12-week pilot has been launched deploying two hydrogen-powered generators developed by GeoPura; the units are shipping container-sized and are being used to support cooling systems at the data center.
  • Supply and location details:GeoPura is supplying hydrogen from renewable sources for the project; the trial is located at Equinix’s Blanchardstown, Dublin site and is described as a short-term pilot (12 weeks) with both generators installed on site.
Keep reading
PEC study finds health impacts from Remington data center power The Piedmont Environmental Council · Jul 09 Multi-tenant and edge data centers address community concerns 365 Data Centers · Jul 09 MHI demonstrates cooling optimization at Fujitsu data center MITSUBISHI HEAVY INDUSTRIES · Jul 09 Pembina criticizes Alberta Meta data center gas plan Pembina Institute · Jul 08
Telborg · US Data Centers
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →

Every field traced to a primary source.