Infocast PowerUp Data Center – Infrastructure Summit in Austin

Troutman Pepper Locke · June 10, 2026 · ✓ verified

Troutman Pepper Locke is a Platinum Sponsor of Infocast’s PowerUp Data Centers – Infrastructure Summit 2026.

  • Event details: The Summit takes place July 14–16, 2026 at Hyatt Regency Austin (208 Barton Springs Road, Austin, TX 78704); Troutman Pepper Locke is a Platinum Sponsor and will have partners Andy J. Flavin and Brandon Lobb as panel moderators. Panel schedule highlights: “Dealing with Interconnection Scarcity Challenges” on July 14 at 3:00 p.m. ET (moderated by Andy Flavin) and “Perspectives on Data Center and Grid Infrastructure M&A and Deal Trends” on July 16 at 10:00 a.m. ET (moderated by Brandon Lobb).
  • Scope and context: The Summit will focus on power and infrastructure demands driven by rapid AI and data center growth, including discussion of a reported 300% increase in ERCOT interconnection requests in 2025, topics such as FERC Order No. 1920-B implementation, AI in grid upgrade planning, transmission buildout, bridge power solutions, and financing structures combining commercial real estate and project finance.
Keep reading
PEC Annual Gathering celebrates Longwood Farm conservation victory The Piedmont Environmental Council · Jun 10 New 137-mile Crossroads Transmission Line Energized in New Mexico NextEra Energy · Jun 10 Building the Grid: Aligning Utilities and Developers on Transmission Troutman Pepper Locke · Jun 10 Stop Virginia’s $1.9 Billion Data Center Tax Exemption The Piedmont Environmental Council · Jun 10
Telborg · US Data Centers
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →