Schneider Electric unveils Galaxy PDU 1000kVA for AI densification

Schneider Electric · May 18, 2026 · ✓ verified

Schneider Electric has announced the Galaxy PDU 1000kVA and promoted an integrated AI-ready data center infrastructure.

  • Main announcement: Schneider Electric introduces the Galaxy PDU 1000kVA (1 MVA)—a purpose-built, 3-phase PDU with 480V input and 400/415V output—to support high-density AI clusters and simplify deployment, reduce commissioning time, and minimize footprint. The article cites rack densities up to 142kW per rack (example: NVIDIA GB300) and cluster building blocks moving from ~500kW to ~2.5MW as context for the product.
  • Background and details: The piece frames densification as an end-to-end infrastructure challenge requiring integrated power, cooling, metering, monitoring, and services (EcoStruxure IT, HDPM6000, PM8000, Motivair liquid cooling). It is an announcement/marketing blog post published on May 18, 2026 by Vance Peterson and includes technical links and product guides for deployment.
Keep reading
Investor Tour 2026 showcases Armenia's AI startup ecosystem Darpass · Nov 19 ITIF webinar on public opposition to data centers Information Technology and Innovation Foundation · Aug 26 Datum adds PoPs in three DataBank facilities DataBank · Aug 18 Qualcomm report touts distributed AI for South Korea Access Partnership · Aug 18
Telborg · US Data Centers
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →

Every field traced to a primary source.