Wistron opens Fort Worth AI manufacturing plant

NVIDIA · July 21, 2026 · ✓ verified

Wistron has announced the opening of its first U.S. manufacturing facility in Fort Worth, Texas, to produce superchips for NVIDIA AI systems.

  • The 324,000-square-footD1 facility is now operating in Fort Worth and currently has two manufacturing cells: one for the NVIDIA GB300 Grace Blackwell Ultra Superchip and one for the NVIDIA Vera Rubin Superchip.
  • Wistron says the plant represents a $700 million commitment and has created over 500 jobs, with plans to reach 1,000 jobs by the end of the year; the facility was designed and simulated virtually before construction using NVIDIA tools including Omniverse, Nemotron, Cosmos, Metropolis, and PhysicsNeMo.
Keep reading
AMAX details on-prem real-time voice AI with NVIDIA Riva AMAX Engineering · Jul 21 NVIDIA Vera Rubin ramps up gigascale AI production NVIDIA · Jul 21 NVIDIA launches Spectrum-6 for gigascale AI factories NVIDIA · Jul 21 Greenpeace Canada links wildfires to fossil fuel policy Greenpeace Canada · Jul 21
Telborg · US Data Centers
Track the US data-center buildout — every day.

Real-time verified news and daily AI-written briefings, built from primary sources — power, grid, permits, land, financing. Start free.

Get Telborg Pro · $189/mo Get the daily briefing — free →

Every field traced to a primary source.