US Data Center News & Briefings
Power, grid, permits & projects across every US county — verified, cited, updated daily.
CA · State profile

California Data Center Intel

Latest data center news, projects, power and policy across California — updated daily.

California · Construction & power moves · 1

full tracker →

Land, power, and interconnection moves across California — each traced to primary filings.

Top JUST IN — California

  • Sep 12, 2026 · interconnection filing

    CAISO schedules Large Loads Initiative stakeholder meeting and draft final proposal comment period

    Source: California ISO · Sep 10, 2026

    According to CAISO, the ISO will host a hybrid stakeholder meeting on Oct. 1, 2026 for the Large Loads Initiative, post a draft final proposal on Sep. 24, 2026, and open comments due by Oct. 15, 2026. CAISO also says stakeholders will review the proposal before it goes to the Board of Governors and before the ISO files tariff language with FERC, indicating an active regulatory process for large loads in California.

    Backed by 1 primary filing — sign in or book a call to see all sources.

  • Aug 24, 2026 · interconnection filing

    Large Loads Initiative: Additional discussion of operational and technical requirements, call on 8/24/26

    Source: California ISO · Aug 17, 2026

    California ISO said it scheduled an additional stakeholder meeting for the Large Loads Initiative “to provide additional time, if needed, to discuss the operational and technical requirements” in the Large Loads Straw Proposal and Large Loads Technical Requirements Straw Proposal, with topics including “Operational requirements” and “Technical requirements” (California ISO, Aug. 17, 2026). The notice also says the Aug. 24 meeting was contingent and ultimately unnecessary because “We were able to cover all of the material and will no longer need the meeting on 8/24.”

    Backed by 1 primary filing — sign in or book a call to see all sources.

  • Aug 15, 2026 · interconnection filing

    Large Loads Initiative: Straw proposal posted, meeting on 8/19/26

    Source: California ISO · Aug 12, 2026

    California ISO says that, following the FERC “June 18, 2026, Order to Show Cause,” its Large Loads Initiative is the “primary forum” for possible “tariff, policy, and process enhancements” affecting large-load integration on the ISO-controlled grid, including “planning, interconnection, transmission service, reliability, and operational considerations.” CAISO also says the straw proposal will address “Cost Shifting Risk Among Transmission Customers,” “Co-Location Arrangements and Load with Behind the Meter Generation,” and “Interconnection Customers Serving Electrically Proximate Large Load and Co-Located Load.”

    Backed by 1 primary filing — sign in or book a call to see all sources.

  • Aug 2, 2026 · interconnection filing

    Large Loads Considerations: Comment deadline on information session moved to 2/25/26

    Source: California ISO · Feb 12, 2026

    California ISO said it “has moved the deadline for written comments on the Large Load Considerations issue paper and Feb. 5 meeting discussion to Feb. 25, 2026,” and asked stakeholders to submit comments by end of day Feb. 25, 2026. The notice also says the “issue paper, presentation, and meeting recording are available” on CAISO’s Large Load webpage.

    Backed by 1 primary filing — sign in or book a call to see all sources.

  • Aug 2, 2026 · interconnection filing

    2025 Draft Participating Transmission Owner Per Unit Cost Guides Posted

    Source: California ISO · Apr 03, 2025

    CAISO said it “has posted the Draft Per Unit Cost Guides” and that “participating transmission owners update and publish per unit costs annually as part of the current interconnection study cycle for estimating the cost of facilities required to interconnect resources,” with written comments due by April 30, 2025, according to the California ISO notice.

    Backed by 1 primary filing — sign in or book a call to see all sources.

Recent California data center news

  • Consumer Watchdog Calls On CA Senators To Pledge to Leave Public Office If Their Vote For Pathways Western Grid Leads Trump's FERC To Invalidate Clean Energy Laws

    Consumer Watchdog has warned California State Senators about SB 540, a proposal that could override key environmental laws including the Renewable Portfolio Standards (RPS). Jamie Court, the President of Consumer Watchdog, highlighted that approval of this bill could lead to the invalidation of California’s clean energy goals, and he urged Senators to resign if that happens. He expressed concerns about the management of California’s energy market potentially falling into the hands of coal interests due to the governance change proposed in SB 540. Court pointed out that the bill risks placing California’s environmental laws under the authority of Trump’s Federal Energy Regulatory Commission (FERC), which could undermine the state’s existing renewable energy policies.

  • The data center decade has arrived

    The United States is anticipating a 30% surge in power demand by 2050, primarily driven by the expansion of data centers and the adoption of electric vehicles. Enverus Intelligence Research (EIR) reported a projected 15.83% rise in total annual energy consumption through 2035. The technology sector is entering an unprecedented capital expenditures cycle, with hyperscalers expected to spend over $50 billion annually by the decade’s end. Notably, the Electric Reliability Council of Texas (ERCOT) will host a significant data center facility totaling 2.2 GW by 2027.

  • Peter Kyle’s speech at the techUK Conference 2025

    The UK government, through Guy’s Hospital and innovative firms Apian and Wing, has initiated a drone delivery service for blood samples. This initiative aims to deliver samples for high-risk patients, reducing delivery time from 30 minutes to just 2 minutes. The project has been enabled by the Civil Aviation Authority’s trial extension, aiming to streamline the delivery system to save lives in the face of regulatory challenges. The government is also investing in related technologies under the ‘Invest 2035’ strategy to enhance the health and tech sectors.

  • 🌎 Gas turbine gridlock #236

    Engie recently pulled out of two gas plants in Texas, Perseus and Spenser, due to procurement delays. The White House’s energy abundance agenda and rising electricity demand from data centers highlight the role of natural gas. However, gas turbine manufacturers are facing severe delays, with delivery backlogs extending to 2029. As a result, the gas plant projects are threatened, prompting developers to plan equipment acquisition well into the future.

  • Diversified Energy, FuelCell Energy, and TESIAC Collaborate to Form an Acquisition and Development Company to Leverage Coal Mine Methane and Natural Gas for Off-Grid Data Center Power Projects

    The United States-based Diversified Energy, FuelCell Energy, and TESIAC announced a partnership targeting data center energy needs by leveraging coal mine methane (CMM) and natural gas to provide as much as 360 megawatts of electricity across Virginia, West Virginia, and Kentucky. This initiative aims to develop an Acquisition and Development Company focused on delivering reliable, net-zero power generation solutions. The partnership emphasizes fast deployment and economic growth, while aiming for a reduction in carbon emissions through efficient energy generation methods. The strategy anticipates the creation of numerous jobs and supports the growth of sustainable energy infrastructure.

  • Diversified Energy, FuelCell Energy, and TESIAC Collaborate to Form an Acquisition and Development Company to Leverage Coal Mine Methane and Natural Gas for Off-Grid Data Center Power Projects

    US-based Diversified Energy, FuelCell Energy, and TESIAC have entered into a strategic partnership to create an Acquisition and Development Company focused on delivering reliable, cost-efficient, net-zero power from natural gas and captured coal mine methane (CMM) to data centers. The collaboration aims to supply up to 360 megawatts of electricity to data centers across Virginia, West Virginia, and Kentucky. This innovative approach leverages in-basin natural gas production and advanced fuel cell technology to generate on-site, continuous power, enhancing efficiency and reducing carbon emissions while supporting local economic growth.

  • https://cleanpower.org/wp-content/uploads/gateway/2025/03/US_National_Power_Demand_Study_2025_FINAL.pdf

    US-based American Clean Power Association, along with several other organizations including the American Petroleum Institute, Alliance to Save Energy, Clean Energy Buyers Association, Nuclear Energy Institute, the U.S. Chamber of Commerce, and the National Electrical Manufacturers Association, commissioned a study by S&P Global Commodity Insights. The study, titled ‘US National Power Demand Study’, was released on March 7, 2025. It projects a significant growth in electricity demand in the US, driven by manufacturing, data centers, and the electrification of heating and transportation. The study highlights the need for substantial additions to the energy supply, including 60 to 100 GW of gas and over 900 GW of renewables and batteries by 2040. It also emphasizes the importance of energy efficiency and clean firm technologies like advanced nuclear and geothermal in maintaining grid reliability and reducing carbon emissions. The study identifies challenges such as outdated interconnection processes, local opposition, and supply chain constraints, and suggests policy reforms to address these issues. The report also notes that wholesale power prices could be around 20% higher in the short term due to higher gas prices and increased demand.

  • UPS Battery Replacement Guide: Upgrading to LiFePO4 (Lithium Iron Phosphate) Batteries

    US-based Keheng Battery has emphasized the advantages of Lithium Iron Phosphate (LiFePO4) batteries for Uninterruptible Power Supply (UPS) systems. These batteries offer significantly longer lifespans compared to traditional lead-acid batteries, potentially lasting up to 10 years. Additionally, they require much less maintenance and are safer for the environment as they do not contain toxic materials. As businesses strive for sustainability, incorporating LiFePO4 batteries aligns with eco-friendly practices and reduces operational costs.

  • Data center supply, construction surged in 2024 amid AI boom

  • How much energy will AI really consume? The good, the bad and the unknown

    US-based Virginia has seen a significant increase in data-centre construction, which could double electricity demand in the state within the next decade. Virginia is known as the data-centre capital of the world with 340 facilities already established. Experts have raised concerns about the rise in energy usage related to AI training, particularly as big tech firms expand their operations. In Ireland, data centres account for over 20% of the country’s electricity consumption, showcasing a global trend in energy demand. Economic benefits are noted, but so are the potential local impacts on power infrastructure.

Need California-wide diligence on power, zoning, permitting?

Book a 20-min call