Getting your news
Attempting to reconnect
Finding the latest in Climate
Hang in there while we load your news feed
California Data Center Intel
Latest data center news, projects, power and policy across California — updated daily.
California · Construction & power moves · 1
full tracker →Land, power, and interconnection moves across California — each traced to primary filings.
Top JUST IN — California
-
CAISO posts revised draft tariff language for Large Loads initiative
Source: California ISO · Oct 27, 2026CAISO said it “has posted revised draft tariff language on the Large Loads initiative webpage,” and that the “revisions incorporate stakeholder input” from comments and the Oct. 19, 2026 stakeholder meeting. This is a policy-level large-load tariff development in California, but the notice does not give project counts, MW, or specific sites.
Backed by 1 primary filing — sign in or book a call to see all sources.
-
CAISO posts Large Loads Initiative draft final proposal and tariff language for comment (Large Loads Initiative)
Source: California ISO · Sep 24, 2026CAISO says its Large Loads Initiative draft final proposal and draft tariff language would add rules for large loads, including “Procedures to improve large load information visibility,” a “Framework to prevent cost-shifting,” and a “Framework for a flexible interim load interconnection (FILI) service to expedite interconnection.” CAISO also says the proposal adds detail on “operational requirements for the FILI framework” and “interactions between load interconnection studies and the transmission planning process,” while deferring a permanent flexible load interconnection option to future stakeholder processes.
Backed by 1 primary filing — sign in or book a call to see all sources.
-
CAISO schedules Large Loads Initiative stakeholder meeting and draft final proposal comment period
Source: California ISO · Sep 10, 2026According to CAISO, the ISO will host a hybrid stakeholder meeting on Oct. 1, 2026 for the Large Loads Initiative, post a draft final proposal on Sep. 24, 2026, and open comments due by Oct. 15, 2026. CAISO also says stakeholders will review the proposal before it goes to the Board of Governors and before the ISO files tariff language with FERC, indicating an active regulatory process for large loads in California.
Backed by 1 primary filing — sign in or book a call to see all sources.
-
Large Loads Initiative: Additional discussion of operational and technical requirements, call on 8/24/26
Source: California ISO · Aug 17, 2026California ISO said it scheduled an additional stakeholder meeting for the Large Loads Initiative “to provide additional time, if needed, to discuss the operational and technical requirements” in the Large Loads Straw Proposal and Large Loads Technical Requirements Straw Proposal, with topics including “Operational requirements” and “Technical requirements” (California ISO, Aug. 17, 2026). The notice also says the Aug. 24 meeting was contingent and ultimately unnecessary because “We were able to cover all of the material and will no longer need the meeting on 8/24.”
Backed by 1 primary filing — sign in or book a call to see all sources.
-
Large Loads Initiative: Straw proposal posted, meeting on 8/19/26
Source: California ISO · Aug 12, 2026California ISO says that, following the FERC “June 18, 2026, Order to Show Cause,” its Large Loads Initiative is the “primary forum” for possible “tariff, policy, and process enhancements” affecting large-load integration on the ISO-controlled grid, including “planning, interconnection, transmission service, reliability, and operational considerations.” CAISO also says the straw proposal will address “Cost Shifting Risk Among Transmission Customers,” “Co-Location Arrangements and Load with Behind the Meter Generation,” and “Interconnection Customers Serving Electrically Proximate Large Load and Co-Located Load.”
Backed by 1 primary filing — sign in or book a call to see all sources.
Recent California data center news
-
Sunrise brief: U.S. distributed generation solar panel prices decline on oversupply
US-based Qcells received a $1.45 billion loan guarantee from the Department of Energy (DOE) for its Georgia solar plant, aiming to boost domestic solar manufacturing. PVH introduced a U.S.-made solar foundation system, the first to meet 100% domestic content standards. Prices for distributed generation solar panels have fallen 7% since August due to oversupply.
-
The POWER Interview: Energy Storage Also Eyed for Data Centers
US-based Pure Storage, a data services company, has reported significant achievements in data center sustainability through their storage innovations. The company has helped data centers reduce energy use by 20%, lower carbon emissions by up to 85%, and generate 97% less electronic waste. Pure Storage has already achieved a 52% reduction in Scope 3 emissions, progressing toward their 2030 goal of 66% reduction. The company’s initiatives focus on enhancing energy efficiency across digital infrastructure through their Purity flash operating system and DirectFlash Modules.
-
Report: More Records for U.S. Energy Storage Deployment
The US energy storage market has achieved record-breaking growth in Q3 2023, with total deployments of 3,806 MW and 9,931 MWh, representing an 80% and 58% increase year-over-year. Texas and California led the grid-scale segment, with Texas tripling installations to 1.7 GW and California adding 6 GWh. The residential sector also set an all-time record with 346 MW installed, showing strong growth across multiple market segments.
-
US energy storage market has record-breaking Q3
-
Aypa secures 1 GWh Arizona battery, Arevon activates 600 MWh Tesla battery
US-based companies Aypa Power and Arevon Energy have announced major battery energy storage developments in Arizona and California. Aypa Power has secured $398 million financing for a 250 MW/1 GWh battery storage project in Mesa, Arizona, while Arevon has activated the first phase of its Eland solar-plus-storage site in Mojave, California, featuring 384 MWdc of solar and 150 MW/600 MWh of energy storage capacity. The total combined battery storage capacity amounts to 2.2 GWh.
-
Bloom Energy Announces Project Funding Partnership with Industry Leaders HPS Investment Partners and Industrial Development Funding
-
Planning cools again on slower data center growth
-
Un tercer trimestre récord para las instalaciones de energía limpia en Estados Unidos
US clean energy installations have reached a record in Q3 2024 with 10.2 GW of new capacity added, bringing the year-to-date total to 29.6 GW, an 86% increase from 2023. The American Clean Power Association (ACP) reports that utility-scale solar led with 6.3 GW installed in Q3, while energy storage added 3.5 GW. TotalEnergies’ Danish Fields Solar project in Texas, with 600 MW capacity and 150 MW/225 MWh battery storage, was the largest commissioned project. The US now has 294 GW of total clean energy capacity, serving approximately 72 million American homes.
-
Meta taps Turner, DPR, Mortenson for $10B data center
US-based Meta has announced a $10 billion data center investment in Louisiana’s Monroe area, with a commitment to power it with 100% renewable energy. The 4-million-square-foot facility will be Meta’s largest AI-focused data center, requiring 1,500 megawatts of new renewable energy capacity. The project includes a $200 million investment in local infrastructure upgrades.
-
The great grid transition in the age of data centers and EVs
US energy grid is facing unprecedented strain from growing data center and EV charging demands. The article discusses how microgrids are emerging as a solution for grid resilience and sustainability, with current microgrid projects costing between $2-5 million per megawatt. Schneider Electric executives highlight the transformation towards a decentralized energy network incorporating microgrids and distributed energy resources (DERs) to meet growing power demands while supporting sustainability goals.