US Data Center News & Briefings
Power, grid, permits & projects across every US county — verified, cited, updated daily.
CA · State profile

California Data Center Intel

Latest data center news, projects, power and policy across California — updated daily.

California · Construction & power moves · 1

full tracker →

Land, power, and interconnection moves across California — each traced to primary filings.

Top JUST IN — California

  • Nov 22, 2026 · interconnection filing

    CAISO storage participation and metering requirements (storage)

    Source: CAISO

    CAISO’s Storage page says participation in the ISO market requires “a scheduling coordinator and ISO-certified revenue-quality meters,” and that “Bidding in ancillary services requires special certification and installation of direct telemetry.” It also lays out storage participation models, including pumped storage, non-generator resources, and proxy demand resource - load shift resource.

    Backed by 1 primary filing — sign in or book a call to see all sources.

  • Oct 28, 2026 · interconnection filing

    CAISO posts revised draft tariff language for Large Loads initiative

    Source: California ISO · Oct 27, 2026

    CAISO said it “has posted revised draft tariff language on the Large Loads initiative webpage,” and that the “revisions incorporate stakeholder input” from comments and the Oct. 19, 2026 stakeholder meeting. This is a policy-level large-load tariff development in California, but the notice does not give project counts, MW, or specific sites.

    Backed by 1 primary filing — sign in or book a call to see all sources.

  • Sep 26, 2026 · interconnection filing

    CAISO posts Large Loads Initiative draft final proposal and tariff language for comment (Large Loads Initiative)

    Source: California ISO · Sep 24, 2026

    CAISO says its Large Loads Initiative draft final proposal and draft tariff language would add rules for large loads, including “Procedures to improve large load information visibility,” a “Framework to prevent cost-shifting,” and a “Framework for a flexible interim load interconnection (FILI) service to expedite interconnection.” CAISO also says the proposal adds detail on “operational requirements for the FILI framework” and “interactions between load interconnection studies and the transmission planning process,” while deferring a permanent flexible load interconnection option to future stakeholder processes.

    Backed by 1 primary filing — sign in or book a call to see all sources.

  • Sep 12, 2026 · interconnection filing

    CAISO schedules Large Loads Initiative stakeholder meeting and draft final proposal comment period

    Source: California ISO · Sep 10, 2026

    According to CAISO, the ISO will host a hybrid stakeholder meeting on Oct. 1, 2026 for the Large Loads Initiative, post a draft final proposal on Sep. 24, 2026, and open comments due by Oct. 15, 2026. CAISO also says stakeholders will review the proposal before it goes to the Board of Governors and before the ISO files tariff language with FERC, indicating an active regulatory process for large loads in California.

    Backed by 1 primary filing — sign in or book a call to see all sources.

  • Aug 24, 2026 · interconnection filing

    Large Loads Initiative: Additional discussion of operational and technical requirements, call on 8/24/26

    Source: California ISO · Aug 17, 2026

    California ISO said it scheduled an additional stakeholder meeting for the Large Loads Initiative “to provide additional time, if needed, to discuss the operational and technical requirements” in the Large Loads Straw Proposal and Large Loads Technical Requirements Straw Proposal, with topics including “Operational requirements” and “Technical requirements” (California ISO, Aug. 17, 2026). The notice also says the Aug. 24 meeting was contingent and ultimately unnecessary because “We were able to cover all of the material and will no longer need the meeting on 8/24.”

    Backed by 1 primary filing — sign in or book a call to see all sources.

Recent California data center news

  • Long-Term Load Forecast Update | Data Centers Lead the Way

    Enverus Intelligence Research (EIR) updated its long-term load forecast, now predicting a 30% increase in U.S. power demand by 2050. This is a revision from the previous estimate of 39%. The report highlights that the reshoring trend will contribute less than 3% to average load growth, while forecasts for data centers show an average load increase of 41 GW through 2035. Key regions identified for load growth are ERCOT Far West, PJM Dominion, with factors such as oil field electrification and the expansion of data centers driving demand.

  • Could geothermal meet rising data center electricity demand?

    The Rhodium Group, in a report released on March 11, 2025, explored the potential of geothermal energy to meet the rising electricity demand from data centers due to the expanding use of artificial intelligence (AI). The report suggests that enhanced geothermal systems (EGS) could supply up to 64% of projected data center demand growth by the early 2030s, and in optimal conditions, cover 100% of demand at lower costs than conventional electricity. If AI companies prioritize siting data centers near geothermal resources, geothermal energy could meet 100% of projected demand growth while cutting costs and emissions.

  • Consumer Watchdog Calls On CA Senators To Pledge to Leave Public Office If Their Vote For Pathways Western Grid Leads Trump's FERC To Invalidate Clean Energy Laws

    Consumer Watchdog has warned California State Senators about SB 540, a proposal that could override key environmental laws including the Renewable Portfolio Standards (RPS). Jamie Court, the President of Consumer Watchdog, highlighted that approval of this bill could lead to the invalidation of California’s clean energy goals, and he urged Senators to resign if that happens. He expressed concerns about the management of California’s energy market potentially falling into the hands of coal interests due to the governance change proposed in SB 540. Court pointed out that the bill risks placing California’s environmental laws under the authority of Trump’s Federal Energy Regulatory Commission (FERC), which could undermine the state’s existing renewable energy policies.

  • The data center decade has arrived

    The United States is anticipating a 30% surge in power demand by 2050, primarily driven by the expansion of data centers and the adoption of electric vehicles. Enverus Intelligence Research (EIR) reported a projected 15.83% rise in total annual energy consumption through 2035. The technology sector is entering an unprecedented capital expenditures cycle, with hyperscalers expected to spend over $50 billion annually by the decade’s end. Notably, the Electric Reliability Council of Texas (ERCOT) will host a significant data center facility totaling 2.2 GW by 2027.

  • Peter Kyle’s speech at the techUK Conference 2025

    The UK government, through Guy’s Hospital and innovative firms Apian and Wing, has initiated a drone delivery service for blood samples. This initiative aims to deliver samples for high-risk patients, reducing delivery time from 30 minutes to just 2 minutes. The project has been enabled by the Civil Aviation Authority’s trial extension, aiming to streamline the delivery system to save lives in the face of regulatory challenges. The government is also investing in related technologies under the ‘Invest 2035’ strategy to enhance the health and tech sectors.

  • 🌎 Gas turbine gridlock #236

    Engie recently pulled out of two gas plants in Texas, Perseus and Spenser, due to procurement delays. The White House’s energy abundance agenda and rising electricity demand from data centers highlight the role of natural gas. However, gas turbine manufacturers are facing severe delays, with delivery backlogs extending to 2029. As a result, the gas plant projects are threatened, prompting developers to plan equipment acquisition well into the future.

  • Diversified Energy, FuelCell Energy, and TESIAC Collaborate to Form an Acquisition and Development Company to Leverage Coal Mine Methane and Natural Gas for Off-Grid Data Center Power Projects

    The United States-based Diversified Energy, FuelCell Energy, and TESIAC announced a partnership targeting data center energy needs by leveraging coal mine methane (CMM) and natural gas to provide as much as 360 megawatts of electricity across Virginia, West Virginia, and Kentucky. This initiative aims to develop an Acquisition and Development Company focused on delivering reliable, net-zero power generation solutions. The partnership emphasizes fast deployment and economic growth, while aiming for a reduction in carbon emissions through efficient energy generation methods. The strategy anticipates the creation of numerous jobs and supports the growth of sustainable energy infrastructure.

  • Diversified Energy, FuelCell Energy, and TESIAC Collaborate to Form an Acquisition and Development Company to Leverage Coal Mine Methane and Natural Gas for Off-Grid Data Center Power Projects

    US-based Diversified Energy, FuelCell Energy, and TESIAC have entered into a strategic partnership to create an Acquisition and Development Company focused on delivering reliable, cost-efficient, net-zero power from natural gas and captured coal mine methane (CMM) to data centers. The collaboration aims to supply up to 360 megawatts of electricity to data centers across Virginia, West Virginia, and Kentucky. This innovative approach leverages in-basin natural gas production and advanced fuel cell technology to generate on-site, continuous power, enhancing efficiency and reducing carbon emissions while supporting local economic growth.

  • https://cleanpower.org/wp-content/uploads/gateway/2025/03/US_National_Power_Demand_Study_2025_FINAL.pdf

    US-based American Clean Power Association, along with several other organizations including the American Petroleum Institute, Alliance to Save Energy, Clean Energy Buyers Association, Nuclear Energy Institute, the U.S. Chamber of Commerce, and the National Electrical Manufacturers Association, commissioned a study by S&P Global Commodity Insights. The study, titled ‘US National Power Demand Study’, was released on March 7, 2025. It projects a significant growth in electricity demand in the US, driven by manufacturing, data centers, and the electrification of heating and transportation. The study highlights the need for substantial additions to the energy supply, including 60 to 100 GW of gas and over 900 GW of renewables and batteries by 2040. It also emphasizes the importance of energy efficiency and clean firm technologies like advanced nuclear and geothermal in maintaining grid reliability and reducing carbon emissions. The study identifies challenges such as outdated interconnection processes, local opposition, and supply chain constraints, and suggests policy reforms to address these issues. The report also notes that wholesale power prices could be around 20% higher in the short term due to higher gas prices and increased demand.

  • UPS Battery Replacement Guide: Upgrading to LiFePO4 (Lithium Iron Phosphate) Batteries

    US-based Keheng Battery has emphasized the advantages of Lithium Iron Phosphate (LiFePO4) batteries for Uninterruptible Power Supply (UPS) systems. These batteries offer significantly longer lifespans compared to traditional lead-acid batteries, potentially lasting up to 10 years. Additionally, they require much less maintenance and are safer for the environment as they do not contain toxic materials. As businesses strive for sustainability, incorporating LiFePO4 batteries aligns with eco-friendly practices and reduces operational costs.

Need California-wide diligence on power, zoning, permitting?

Book a 20-min call