Getting your news
Attempting to reconnect
Finding the latest in Climate
Hang in there while we load your news feed
Florida Data Center Intel
Latest data center news, projects, power and policy across Florida — updated daily.
Florida · Construction & power moves · 2
full tracker →Land, power, and interconnection moves across Florida — each traced to primary filings.
Recent Florida data center news
-
Central Illinois data center policies advance; environmental, utility concerns remain
Logan County Board advanced local consideration of data-center policy as residents and utilities raised concerns about specific projects (including a proposed 500-megawatt site near Latham).
- Main action: Logan County held a special meeting (March 6, 2026) where residents opposed a proposed 500-megawatt data center near Latham; counties across Central Illinois are drafting local rules covering construction, noise, environmental impacts and potential utility rate increases.
- Background and details: The article documents public opposition, references a related Logan County meeting on March 5, 2026 about hiring a data-center consultant, notes concerns over noise, environmental impact and utility rates, and situates the debate within broader interest in data centers driven by the AI race and existing multi-tenant facilities such as Digital Realty in Chicago.
-
U.S. Issues First Commercial Construction Permit for a Nuclear Reactor in Years
The U.S. Nuclear Regulatory Commission approved a construction permit for a TerraPower subsidiary to build a sodium-cooled commercial reactor in western Wyoming.
- Main announcement: The NRC issued its first construction permit for a commercial reactor in eight years, allowing TerraPower to begin construction within weeks on an up-to $4 billion plant near Kemmerer, Wyoming; completion is targeted for 2030 and the reactor is rated 345 megawatts (up to 500 MW peak).
- Background and details: The permit is the NRC’s first for a non-light-water commercial reactor in more than 40 years; the plant will be sited beside a coal-fired plant being converted to natural gas, will use molten sodium as a coolant, and TerraPower says it is lining up sources of highly enriched uranium domestically and in South Africa. In January, the U.S. Department of Energy announced a first step toward modernizing the fuel cycle and invited states to express interest by April 1.
-
Why Communities Can and Must Consider Electricity Affordability and Risk Together
Stephen Abbott of RMI argues that communities should consider electricity affordability and risk together and pursue diverse, distributed energy portfolios rather than relying solely on large centralized fossil-fuel generation.
- Main announcement/action: Communities and local governments should adopt portfolio-based energy strategies (energy efficiency, batteries, renewables, virtual power plants, and other flexible resources) to reduce price volatility and operational risk; RMI highlights concrete examples including data center-driven load growth of 32% by 2030, and Burlington’s 59,204 MWh annual reduction from its energy efficiency program.
- Background and details: The piece cites recent cost and risk evidence: ComEd provided $277 million (2024) for efficiency programs yielding an estimated $3.2 billion in customer savings; reliance on fossil fuels produced at least $390 million in excess costs for communities around the Prairie State Energy Campus over four years; typical monthly fuel charges in Florida doubled from ~$20 to ~$40 (2020–2023); utilities such as TVA are proposing large new gas facilities as a conventional response.
-
$12B Amazon data center build will rely on surplus water
Amazon has announced a $12 billion multi-site data center campus across Caddo and Bossier Parishes in Louisiana.
- Project scope & funding: Amazon will invest $12 billion to develop interconnected campuses in Caddo and Bossier Parishes, including $400 million allocated for local water infrastructure (using only verified surplus water) and a $250,000 community fund for STEM and local projects. Construction is expected to start in the coming weeks; STACK Infrastructure will lead development and Southwestern Electric Power Company will be the local utility partner with Amazon paying 100% of new energy infrastructure expenses.
- Context & related projects: The announcement follows other multibillion-dollar data center projects in Louisiana, including Jacobs starting phase one of a $10 billion Hut 8 project (Hut 8 expects operations to begin Q2 2027) and a $10 billion Meta data center near Monroe being built by Turner, DPR and Mortenson. The article is an announcement summarizing Amazon’s commitment and situating it within recent regional data center investments.
-
Climate Change Solutions - February 24, 2026
The Environmental and Energy Study Institute (EESI) released a newsletter highlighting data center impacts, policy developments on Capitol Hill, and upcoming briefings and events.
Main announcement: EESI highlighted rising household energy costs driven in part by data center demand, noting electricity prices have risen by up to 267% since 2020 in high-concentration data center areas and that wildfires cost the United States up to $424 billion annually. The newsletter features the article “Data Center Power Demands Are Contributing to Higher Energy Bills,” a podcast on wildfire philanthropy, and announces briefings including “Understanding Load Growth and Energy Affordability” on Thursday, February 26 (3:30 p.m. - 5:00 p.m., Rayburn House Office Building, Gold Room (Room 2168) and online).
Background and other details: The newsletter summaries recent legislative actions and events: Senate Energy Committee advanced the Critical Mineral Consistency Act of 2025 (S.714); House Committee approved the ACERO Act (H.R.390) to authorize NASA’s ACERO project; Senate Foreign Relations agreed to the Protecting Global Fisheries Act of 2026 (S.1369); House introduced the Farm, Food, and National Security Act of 2026 (H.R.7567). Events listed with dates/times/locations:
- Understanding Load Growth and Energy Affordability — Feb 26, 3:30 p.m. - 5:00 p.m., Rayburn House Office Building, Gold Room (Room 2168) and online
- Igniting Innovation: Progress and a Path Forward for Wildfire Policy — Mar 3, 3:00 p.m. - 4:30 p.m., Russell Senate Office Building, Room 385 and online (Reception to follow)
- Strategies to Lower Utility Bills Now for Households and Small Businesses — Mar 12, 3:00 p.m. - 4:30 p.m., Rayburn House Office Building, Gold Room (Room 2168) and online
- 2026 Congressional Renewable Energy and Energy Efficiency EXPO and Policy Forum (EXPO 2026) — Jun 24, 9:00 a.m. - 7:00 p.m., Rayburn House Office Building Foyer and Gold Room and online
-
CTA Official Says It’s Time to Reclaim and Auction TV Station Spectrum
The Consumer Technology Association’s SVP Michael Petricone called on Congress to pursue an “Incentive Auction 2.0” to reclaim and auction spectrum licensed to TV station owners.
- Main action: Michael Petricone (CTA SVP of Government & Regulatory Affairs) urged Congress to reclaim broadcaster-held spectrum via an “Incentive Auction 2.0”, to auction it openly and let the market allocate it to its highest value uses; he also called for removing regulatory advantages that favor legacy TV stations and criticized proposals to loosen ownership rules to permit more mergers and consolidation.
- Background and other details: The National Association of Broadcasters (Grace Whaley) pushed back defending local stations and praising FCC Chairman Brendan Carr for modernizing rules; the article also references related telecom items including Akamai opposing a USF tax on CDNs, calls to protect CBRS from auction, four ISPs joining an open-access network in Los Alamos, a Florida bill to make Big Tech pay data center energy bills, and a Starlink–Microsoft partnership to serve developing nations.
-
NVIDIA Brings AI-Powered Cybersecurity to World’s Critical Infrastructure
NVIDIA is collaborating with Akamai, Forescout, Palo Alto Networks, Xage Security and Siemens to bring accelerated computing and AI to OT cybersecurity.
- Main announcement: NVIDIA and partners will embed AI-driven, zero-trust security into OT/ICS by running security services on NVIDIA BlueField DPUs, enabling agentless discovery, agentless segmentation, local inspection/enforcement at the edge, and centralized analysis in AI factories; demonstrations are scheduled at S4x26 (Feb. 24–26, Miami).
- Details and background:Forescout provides continuous, agentless discovery and policy enforcement for OT/IoT/IT; Akamai has extended the Guardicore Platform to run on BlueField for agentless segmentation; Palo Alto’s Prisma AIRS runs on BlueField for deep traffic inspection; Xage (which already protects about 60% of U.S. midstream pipeline infrastructure) will show zero-trust integrations on BlueField; Siemens will demonstrate an AI-ready Industrial Automation DataCenter with IEC 62443-aligned cybersecurity and edge data center capabilities.
-
Data centers in Ohio: Economic boost or environmental burden?
House Bill 646 would create a data center study commission to examine data center expansion across Ohio and assess environmental and grid impacts before projects move forward.
- Main announcement: House Bill 646 proposes a bipartisan data center study commission that will examine environmental effects, electrical grid impacts, water usage, noise, and local economic impacts prior to project approvals; the bill is currently in committee.
- Background & details: Ohio has about 200 data centers (many clustered in Central Ohio); New Albany has seen 14 companies build more than 68 data centers (about 40 operational). Policy Matters Ohio reports at least $140 million in tax exemptions granted for data center construction and estimates up to $1.6 billion in potential state/local revenue foregone tied to incentives for Amazon, Google and Microsoft. The article cites concerns including a proposed Adams County facility that would use >20x the county’s electricity, potential water use of up to 5 million gallons/day, and reliance on diesel backup generators (sound levels up to 90dB). Microsoft has pledged carbon negative by 2030 and a community-first infrastructure commitment; Amazon aims net-zero by 2040 and to power some operations with nuclear by 2050.
-
AI data centers threaten economic and environmental integrity of Black communities
The Florida Senate Regulated Industries Committee has passed Senate Bill 484 to place new restrictions on large data centers in the state.
- Main action: SB 484 passed the Senate Regulated Industries Committee unanimously during the legislative session; the bill targets large data centers by addressing rate protection, water permitting, local government authority, and public transparency, and explicitly prohibits agencies from entering NDAs that block disclosure of data center impacts to the public.
- Background and supporting facts: A viral TikTok by creator Zamor (posted Dec. 29) drew national attention—the video had over 1 million views and 400,000 likes as of February; reporting and research cited include datacenters.com (U.S. >3,000 data centers; Florida = 145), a Bloomberg report (Sept. 2025) that utilities bills rose 267% around AI data centers, and a Southern Environmental Law Center press release alleging xAI operated 35 unpermitted gas turbines, increasing peak NO2 by 79% in surrounding areas.
-
Renewal Fuels Moves to Become American Fusion, Names 3 to Kepler C‑Suite
Southlake-based Renewal Fuels Inc. has announced it is changing its legal name to American Fusion Inc. and has appointed three senior leaders to Kepler Fusion Technologies after Kepler became its wholly owned subsidiary following a December 2025 merger.
- Main announcement: Renewal Fuels filed to change its legal name to American Fusion Inc. in January 2026, confirmed that Kepler Fusion Technologies (Midland, TX) is now a wholly owned subsidiary after the December 2025 merger, and appointed John E. Brandenburg, Ph.D. (CTO), Dwight Cartwright (COO), and Travis Yakimishyn (Chief Electrical & Power Systems Officer); the company plans a power-as-a-service model with long-term PPAs starting at 6.25 cents per kilowatt-hour and targets industrial sites and data centers for Texatron deployment.
- Background and next steps: Kepler is developing the Texatron aneutronic fusion platform (development stage) and reported more than 238 patents in the pipeline; the company is interviewing candidates for independent board positions and completing steps for a listing on a major exchange (noting the Texas Stock Exchange as a potential fit).