Getting your news
Attempting to reconnect
Finding the latest in Climate
Hang in there while we load your news feed
Florida Data Center Intel
Latest data center news, projects, power and policy across Florida — updated daily.
Florida · Construction & power moves · 2
full tracker →Land, power, and interconnection moves across Florida — each traced to primary filings.
Recent Florida data center news
-
GSN Roundup: Blackstone and Willis Tower, JV’s Big Data Center Refi, and Prestige Closing
Affinius Capital partnership is seeking a $925 million mortgage to refinance the second phase of the Gainesville Crossing Data Center Campus.
- Deal specifics: The JV of Affinius and Corscale is pursuing a $925 million mortgage to refinance a fully leased, 482,000 sq ft building with 72 megawatts of capacity; the borrower prefers a floating-rate loan with a 2–3 year term, and Newmark is advising. The tenant is an undisclosed large cloud-computing provider on an initial 15-year lease; the building is part of a planned five-building campus totaling 306 MW.
- Background & supporting facts: The 130-acre site was bought from Buchanan Partners in mid-2020 for $74.5 million after rezoning in late 2019; Corscale is the data-center arm of Patrinely and Affinius’ predecessor firm is USAA Real Estate, which helped acquire the site. Financial performance issues led Larry H. Miller Co. to close Prestige Financial Services amid an MLB expansion funding push (expansion fee expected to top $2 billion), and Blackstone is separately exploring options around a $1.32 billion securitized loan on Willis Tower.
-
Switched Source Expands Grid-Enhancing Technology Deployments by 60%
Switched Source reported a 60% increase in deployments of its Phase-EQ grid-enhancing technology over the past year, with units now operating across more than 10 utility service areas from Alaska to Florida.
- Deployment growth & scope: Switched Source reports a 60% increase in deployments year-over-year, with Phase-EQ units operating in more than 10 utility service areas including New York, Alaska, Florida, Georgia, Iowa, Massachusetts, Texas, and Washington state; field data from operational sites shows 10% to 25% increase in load-serving capacity on active distribution circuits.
- Device function & program support: Phase-EQ is described as the first distribution automation device that balances power flow between the three phases by exchanging real and reactive power; the company was founded in 2016 and the project is supported by the U.S. Department of Energy’s ARPA-E SCALEUP program. A recent Georgia Power deployment is designed to reduce load imbalance by half and voltage imbalance by more than 30%, with the utility supplying substation-level data to track performance.
-
Environmental bills to watch as Florida begins the 2026 legislative session
Florida lawmakers have filed multiple environmental bills ahead of the 2026 legislative session in Tallahassee.
Main announcement: Multiple named bills were filed addressing conservation land transparency (House Bill 441 by Rep. Kim Kendall — requires 30 days’ notice and publication of parcel details before Governor and Cabinet land-sale review), septic inspections and monitoring (Senate Bill 1386), the MANTA Protection Act to ban capture/transfer of threatened marine species (Senate Bill 988, House Bill 1171), data center regulations (House Bill 1007 — requires local and state public approvals and other limits), and an Ocklawaha River restoration mandate (House Bill 981 / Senate Bill 1066 — DEP must produce a restoration plan by July 2027 with project completion deadline 2032). The Legislature also recorded that Gov. DeSantis vetoed more than $6.2 million in Ocklawaha restoration funding during last year’s session.
Background and other details: The session includes a Florida Farm Bill proposal (Senate Bill 290) to allow agricultural uses on state-owned conservation land acquired after Jan. 1, 2024, bills to preempt local pollution regulations (House Bill 479 / similar Senate measure), utility oversight and affordability bills (Senate Bill 126 / House Bill 187 and Senate Bill 1532), Nature-based Coastal Resiliency bills (Senate Bill 302 / House Bill 1035), Beach Management (Senate Bill 636 / House Bill 1297), and changes to agricultural enclave certification (House Bill 691 / Senate Bill 686 — 30/90 day local certification timelines). Industry opposition (e.g., data center industry) and advocacy group responses (e.g., Friends of the Everglades) are noted in the reporting.
-
Data centers must follow clean air rules with their large generators, EPA says
The Environmental Protection Agency has created new rules requiring large, portable gas turbines used by data centers to comply with the Clean Air Act and to be permitted under federal law.
- Rule details:New EPA policy states that semitruck-sized portable gas turbines (gas turbines/methane gas turbines) used by hyperscale data centers must meet Clean Air Act emissions limits and that permitting will fall under federal law; officials began reviewing the change in December 2024. The rule removes the prior exemption for large portable generators while retaining new exemptions for medium and small turbines. The Federal Register notice was published on 2026-01-15.
- Background and context:Previous EPA guidance had treated such generators as exempt when used only for short-term or emergency operations; the shift was prompted by the proliferation of generators at hyperscale data centers (including xAI’s Colossus). The article cites local disputes in Memphis, Tennessee, advocacy from the Southern Environmental Law Center, and linked local reporting (ABC24, CBS 42).
-
US Carbon Pollution Rose In 2025, a Reversal From Prior Years
Rhodium Group reported that U.S. carbon emissions rose 2.4% in 2025, reversing prior years’ declines.
- 2.4% increase in 2025: Rhodium Group estimated the U.S. emitted 5.9 billion tons (5.35 billion metric tons) CO2e in 2025, an increase of 139 million tons (126 million metric tons) compared with 2024; the rise was attributed to a cool winter, the explosive growth of data centers and cryptocurrency mining, and higher natural gas prices.
- Study context and additional details: Study authors (Rhodium Group) said environmental policy rollbacks by President Donald Trump’s administration were not significant factors because they were implemented in 2025; the report also noted a 13% increase in coal power (after coal had shrunk by nearly two-thirds since its 2007 peak), per Ben King, director in Rhodium’s energy group.
-
The State of the Science 1 Year On: Environment
The Trump administration has announced multiple rollbacks of U.S. environmental protections and actions to fast-track permits for mining, AI infrastructure, and data centers.
- Major policy actions: Executive orders and budget proposals from the Trump administration include fast-tracking federal permitting for data-center infrastructure (July executive order), expediting mining permitting (goal: as little as 28 days), and an April executive order to revive coal and designate coal as a critical mineral; the administration also ordered closure of 25 USGS Water Science Centers and proposed cuts to NOAA labs and programs.
- Concrete budget and project details: The FY2026 Omnibus proposal (OBBB / OMB materials) includes $2.46 billion cut to EPA Clean and Drinking Water State Revolving Funds, $1.01 billion cut to categorical grants for air and water quality, and $721 million cut to USDA Rural Development programs; the Interior announced plans to complete the Velvet-Wood mine environmental assessment in 2 weeks and construction of that uranium/vanadium mine began in November 2025.
-
Cleanstar National Inc Expands Critical Environment Cleaning Operations Across the Southeast
Cleanstar National Inc has announced expansion of its specialized critical environment cleaning operations across the Southeastern United States.
- Expansion scope: Cleanstar National Inc is expanding operations across Georgia, Alabama, Florida, South Carolina, North Carolina, and Tennessee to support data centers, healthcare campuses, higher education, industrial facilities, and construction projects; the company cites more than 30 years of experience and a self-performing workforce of over 700 E-Verified professionals and offers audit-ready protocols aligned with EPA, ISO 14644, GMP, OSHA, IICRC, and IJCSA.
- Operational details and background: The company is founder-led since 1995, operates a fully self-performing model with zero outsourcing, provides 24/7 emergency response, and will deliver standardized, compliance-first cleaning services to support multi-site portfolios and regional developments from its Metro Atlanta headquarters.
-
Powering Progress: How Leaders Build on Dell Storage
Dell promotes its industry-leading storage platforms and showcases customer deployments across sectors.
- Main announcement/action: Dell highlights its industry-leading storage portfolio—PowerStore, PowerFlex, PowerMax, PowerScale, and PowerEdge—as the foundation for scalable, reliable data infrastructure used by customers such as The Bank of New York Mellon (using PowerMax and PowerEdge) and Drogaria Araujo; the article cites PowerStore’s 5:1 data reduction guarantee and PowerMax’s multi-site replication as key product capabilities.
- Background and details: The post provides customer examples and use cases: KiTZ (Hopp Children’s Cancer Center Heidelberg) using PowerScale for genomic research in Germany, Lightstorm Entertainment and Cosm for media/entertainment workloads, Fulgent Genetics combining PowerStore and PowerEdge for AI-enabled genetic data processing, University of Missouri modernizing with PowerStore/PowerMax/PowerFlex and PowerEdge, and Texas Christian University adopting PowerScale with PowerEdge for its AI² initiative; links to product pages, case studies, and customer stories are provided.
-
Sustainable Data Centers in the Age of AI: Page Haun, Chief Marketing and ESG Strategy Officer, Cologix
Cologix explained its sustainability approach for AI-era data centers through design, engineering, community engagement, and transparency (as presented by Page Haun on The Data Center Frontier Show).
- Main announcement/action: Cologix described its AI-era sustainability baseline and concrete practices including Montreal 8 (MTL8) achieving LEED Gold, an average WUE of 0.203, PUE of 1.486, 65% carbon-free energy reported in its 2024 ESG report, and deployment plans such as onsite fuel cells in central Ohio under a 15-year contract (Cologix covers full cost while AEP completes transmission upgrades). The company also cites hydropower in Montreal, deep lake water cooling in Toronto, natural air cooling in California, and closed-loop water systems as part of its siting and engineering strategy.
- Background and implementation details: Cologix emphasized collaboration with utilities and governments (sharing long-term load forecasts and infrastructure plans), community engagement (town meetings, local leaders, STEM and relief programs), and transparency (reporting to CDP and EcoVadis, ISO 14001 process, Energy Star expansion). The episode serves as a descriptive briefing rather than a new standalone financial deal announcement; implementation timelines referenced include the 15-year fuel cell contract and multi-year transmission upgrades by utilities.
-
Japan Billionaire Masayoshi Son $161 Billion Softbank Group-Owned Digital Infrastructure Company SB Energy Receives $1 Billion Investment from OpenAI & SoftBank in Strategic Partnership to Support OpenAI Infrastructure Development
SB Energy (part of SoftBank Group) has received a $1 billion investment from OpenAI and SoftBank to support OpenAI infrastructure development.
- Main action:SB Energy received $1 billion from OpenAI & SoftBank in a strategic partnership to support OpenAI infrastructure development (announcement dated 13th January). The company is described as providing energy and digital infrastructure at scale to support America’s energy demands.
- Background and related details:SoftBank Group has multiple related commitments and transactions: completed/committed investments in OpenAI totalling around $40–41 billion (including $30 billion from SoftBank Vision Fund and $11 billion from third-party co-investors), a reported ~$22.5 billion transfer to OpenAI in late December 2025, talks to buy DigitalBridge Group (reported $2.5 billion market value; $108 billion AUM), and other transactions including sale of Nvidia shares ($5.8 billion) and partial T-Mobile sales ($9.1 billion).